{"id":126,"date":"2026-08-13T01:04:16","date_gmt":"2026-08-13T01:04:16","guid":{"rendered":"https:\/\/mysticpointe500owners.org\/?page_id=126"},"modified":"2026-09-06T22:31:02","modified_gmt":"2026-09-06T22:31:02","slug":"roof-replacement-project","status":"publish","type":"page","link":"https:\/\/mysticpointe500owners.org\/?page_id=126","title":{"rendered":"Roof Replacement Project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">We have assembled a substantial documentary record concerning this project, including the bidding process, changes to the scope of work, and the circumstances surrounding a $232,638 check to Best Roofing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The records raise important questions about how the project was managed and how this payment came to be issued.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What the Records Show<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The records allow us to trace how the project and its payments were documented in Association records and to compare those records with explanations subsequently provided to owners.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The Starting Point: Falcon&#8217;s May 2023 Inspection<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before examining how the roof replacement project developed, it is useful to begin with what Falcon Engineering reported in its May 2023 Phase One inspection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Falcon reported that the primary drainage of the main roof was provided by floor drains with grated domes. <strong>While recommending replacement of the existing roof system, Falcon also stated that \u201cno major concerns were observed with respect to the roof drainage at the time of the inspection.\u201d<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The statement concerning the main roof drainage appears on <strong>page 39<\/strong> of the report. The complete document is available in the <strong>Documents<\/strong> section of this website.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A New Drainage Issue Emerges<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An August 28, 2023, correspondence between Falcon Engineering&#8217;s Project Manager Mihaela Hristova and the Board raised a new issue concerning drainage at the PH 2 and PH 14 terraces. Please note that to the best of our knowledge no member of our Board or community has ever met Ms. Hristova, except for the possible exception of its then President Carlos Ilarregui, and the current one, Stewart Glass.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Ms. Hristova reported that she had observed two compromised drains in the common roof area and that the condition would most likely involve the areas adjacent to the divided wall between the common roof and the PH 2 and PH 14 terraces. She also stated that, from a ladder, <strong>no drains and only one scupper were observed at PH 2 and PH 14<\/strong>, and that the existing conditions at those terraces could not be evaluated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">She subsequently presented three possible approaches. The first\u2014and the option she recommended\u2014was to include the PH 2 and PH 14 terraces in the re-roofing work, add a drain on the terrace side, and relocate the existing drain on the main roof. She explained that this was the preferred approach for preventing potential moisture intrusion and preserving the roof warranty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>On the same August 28, the Board President responded that the Board would select one of the options within two days. The following day, Falcon estimated that approximately $4,000 would be required to assess the drainage and prepare a drainage plan, <em>leaving open the possibility for further charges.<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On August 29, the Board President wrote to Falcon: <strong>\u201cThe Board voted unanimously to select Option 1\u201d<\/strong> and instructed Falcon to proceed with the additional work.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What the Records Do Not Show<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We have found no Board minutes, written consent, or other Association record documenting this vote.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Moreover, the statement that the Board voted <strong>\u201cunanimously\u201d<\/strong> raises a fundamental question. Matthew Roth was a member of the Board at the time and did not vote for Option 1.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The emails therefore establish that the Board President told Falcon that the Board had unanimously selected Option 1. They do <strong>not<\/strong>, by themselves, establish that such a unanimous Board vote actually took place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Subsequent records raise additional questions regarding what happened with the proposed drainage work and how the decision affected the scope and cost of the roof replacement project.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The Bidding Process Begins<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>September 19, 2023:<\/strong> Falcon Engineering proposed six contractors to be invited to bid on the roof replacement project: <strong>Empire, Salomon, Best Roofing, Southern Coast, Advance, and DCI.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>September 27, 2023:<\/strong> The six contractors were invited to participate in the bidding process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong> Between September 27, 2023 and January 4, 2024, when contractor <\/strong>interviews eventually took place,<strong> <\/strong>the bidding process moved forward, with Falcon communicating with the invited contractors and developing the specifications that would govern their bids. During this period, however, the field of potential bidders began to narrow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>December 12, 2023:<\/strong> Falcon issued the revised specifications for bidding. The specifications described the roof replacement work as involving the <strong>main and upper roof levels<\/strong>. The penthouse terraces were not identified as part of the base roof-replacement scope<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How Six Potential Bidders Became Two<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>December 21, 2023:<\/strong> Falcon reported that it had received only two bids\u2014Best Roofing and Salomon Roofing. Empire Roofing had requested an extension because its material vendors were out for the holidays. Tamia Craig of Falcon asked Board President Stewart Glass whether the extension for Empire would be granted. Falcon stated that it would proceed with its bid comparison on December 26.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Please see the Tamia Craig email <a href=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/09\/Tamia_Craig_Email_December_21_2023_clean.pdf\">here<\/a>.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There was also an opportunity to broaden the field beyond the six contractors initially identified by Falcon. Alex Bakshiyev, a neighboring owner and licensed contractor, stated on several occasions\u2014including at last October&#8217;s Board meeting\u2014that he knew of several qualified roofing contractors who were willing to bid on the project. His offers to help obtain additional bidders did not result in any additional bids.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Castle Confirmed That Additional Roofing Companies Could Be Obtained<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Castle&#8217;s Regional Director, Jim Koslosky, subsequently confirmed in an email that Castle would obtain additional roofing companies and quotes if the Board directed it to do so. Koslosky also offered to provide a benchmark report identifying roofing companies used by other associations in the area and whether those associations were satisfied with their vendors. The email establishes that expanding the field of potential bidders remained an available option.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Please see the Jim Koslosky email <a href=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/09\/Jim_Koslosky_Castle_Email_March_8_clean1.pdf\">here.<\/a><\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>DCI Raises Concerns About the Bidding Process<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Amy Helms, Chief Estimator for DCI, responded to questions about the roofing bids. DCI was another of the six contractors originally identified by Falcon. DCI did not submit a bid because, according to Amy Helms, the company felt there was bias in the process. She made clear, however, that DCI was willing to participate and would prepare a complete proposal if needed. In other words, DCI was not unwilling to bid; it objected to the way it believed the bidding process was being conducted.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What the Record Shows<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The record raises serious questions about how the Board handled an over million-dollar roofing contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Board had an opportunity to broaden the field of qualified roofing contractors, but that opportunity was not pursued. A licensed owner, Alex Bakshiyev, repeatedly offered to identify additional qualified roofers willing to bid. Castle\u2019s Regional Director, Jim Koslosky, subsequently confirmed in writing that Castle <strong>would obtain additional roofing companies and quotes if the Board directed it to do so.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is an additional and important issue here. <strong>At an open Board meeting, Board President Stewart Glass denied that Koslosky had offered to help obtain additional bidders. Koslosky\u2019s subsequent email directly contradicts that characterization. He also stated<strong>&#8220;I also offered if the board requested additional companies that I could provide a benchmark report of the other associations in the area, which roofing company they used, and if they were pleased with the vendor&#8217;s work or not<\/strong><\/strong>.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, DCI, another contractor originally identified by Falcon, stated that it was willing to participate but believed there was bias in the bidding process. DCI even offered to prepare a complete proposal if needed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In our view, these facts are difficult to reconcile with the idea that the Board was doing everything reasonably possible to obtain competitive bids for a multimillion-dollar expenditure.<\/strong> The issue is not simply that there were only two bids. The more important question is: <strong>why did the Board allow the field of bidders to remain so limited when qualified additional contractors were apparently available?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Restricting competition on a contract of this size can have enormous financial consequences for every owner. We believe owners have every right to question whether the Board obtained the best possible price and whether the bidding process was conducted in the owners\u2019 best interests.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>In our view, the same troubling pattern of limited transparency, questionable explanations, and decisions made without adequate owner scrutiny appears to be continuing in the current fa\u00e7ade restoration project\u2014an undertaking that is expected to cost at least four times as much as the roofing project<\/strong><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We are not neutral observers. <strong>We are owners.<\/strong> We believe that when millions of dollars of owners\u2019 money are at stake, asking difficult questions is not irresponsible or disruptive\u2014it is responsible ownership. <br><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>The circumstances surrounding the $232,638.00 check issued to Best Roofing warrant particular scrutiny. A comparison of how the payment was described during the May 2025 Board meeting with how the same events were described later reveals significant inconsistencies that are difficult to reconcile with the subsequent claim that the check was simply issued in error. A detailed analysis of this transaction, including the relevant records and the conflicting explanations, will be presented on a dedicated page of this website later in September 2026.<\/strong><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have assembled a substantial documentary record concerning this project, including the bidding process, changes to the scope of work, and the circumstances surrounding a $232,638 check to Best Roofing. The records raise important questions about how the project was managed and how this payment came to be issued. What the Records Show The records [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-126","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=126"}],"version-history":[{"count":5,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/126\/revisions"}],"predecessor-version":[{"id":242,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/126\/revisions\/242"}],"wp:attachment":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}