{"id":10,"date":"2026-06-10T00:05:17","date_gmt":"2026-06-10T00:05:17","guid":{"rendered":"https:\/\/mysticpointe500owners.org\/?page_id=10"},"modified":"2026-06-21T00:23:38","modified_gmt":"2026-06-21T00:23:38","slug":"documents","status":"publish","type":"page","link":"https:\/\/mysticpointe500owners.org\/?page_id=10","title":{"rendered":"Documents"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">This page contains documents, photographs, correspondence, analyses, and other materials relevant to matters affecting Mystic Pointe Tower 500.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The information presented on this website is intended to help owners review source materials, better understand significant issues affecting the building, and make informed decisions based on independently verifiable facts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Engineering Reports<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Phase I Structural Assessment Report<\/strong><\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/06\/05.19.23-Mystic-Pointe-Tower-500-Condominium-Association-Structural-Assessment.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"PDF embed\"><\/object><a href=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/06\/05.19.23-Mystic-Pointe-Tower-500-Condominium-Association-Structural-Assessment.pdf\" class=\"wp-block-file__button wp-element-button\" download>Download<\/a><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Falcon Fa\u00e7ade Restoration Project Manual &amp; Specifications (April 2025)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This document contains Falcon Engineering&#8217;s detailed specifications and scope of work used to solicit contractor bids for the 2025 Fa\u00e7ade Restoration Project.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/06\/2025-4-4MPT500FalconFRP-8.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of 2025-4-4MPT500FalconFRP (8).\"><\/object><a id=\"wp-block-file--media-9019063f-cafa-4ecb-bd49-90587c0902c7\" href=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/06\/2025-4-4MPT500FalconFRP-8.pdf\">2025-4-4MPT500FalconFRP (8)<\/a><a href=\"https:\/\/mysticpointe500owners.org\/wp-content\/uploads\/2026\/06\/2025-4-4MPT500FalconFRP-8.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-9019063f-cafa-4ecb-bd49-90587c0902c7\">Download<\/a><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Owner Questions Regarding Project Scope, Cost Controls, and Oversight<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Attached below is a correspondence between Board Member Steve Sayuk and owner Alex Bakshiyev in which questions were raised prior to contract execution concerning project scope, quantity verification, contract structure, cost controls, project oversight, and potential cost escalation in the Facade Restoration and Painting Project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The issues discussed remain relevant to understanding the evolution of the Fa\u00e7ade Restoration Project and the financial implications for owners.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/mysticpointe500owners.org\/?page_id=56\" data-type=\"page\" data-id=\"56\">View Correspondence<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This page contains documents, photographs, correspondence, analyses, and other materials relevant to matters affecting Mystic Pointe Tower 500. The information presented on this website is intended to help owners review source materials, better understand significant issues affecting the building, and make informed decisions based on independently verifiable facts. Engineering Reports Phase I Structural Assessment Report [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-10","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/10","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10"}],"version-history":[{"count":5,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/10\/revisions"}],"predecessor-version":[{"id":115,"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=\/wp\/v2\/pages\/10\/revisions\/115"}],"wp:attachment":[{"href":"https:\/\/mysticpointe500owners.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}